Wind-diesel power plant on Bering Island

2012-2013

Wind-diesel power plant on Bering Island

Location

Russia, Kamchatka Region, Bering Island, Nikolskoye settlement

Implementation period

2012-2013

Description of project

Wind-diesel power plant consisting of:

  • Wind farm 550 kW
  • Diesel power plant 1168 kW

Scope of work performed

  • engineering
  • construction

Equipment

Wind farm: 2 WTG Vergnet GEV-MPC 275 kW installed capacity each

Comments

This is one of the first realized projects with difficult logistics due to island location

Wind-diesel power plant at Ust-Kamchatsk settlement

2012-2013

Wind-diesel power plant at Ust-Kamchatsk settlement

Location

Russia, Kamchatka Region, Ust-Kamchatsk settlement

Implementation period

2012-2013

Description of project

Wind-diesel power plant consisting of:

  • Wind farm 275 kW

Scope of work performed

  • engineering
  • construction

Equipment

Wind farm: 1 WTG Vergnet GEV-MPC 275 kW installed capacity (cold climate version)

Comments

This was the first project where Vergnet cold climate turbine installed. Amount of bears at the site during construction phase exceeded all reasonable expectations☺

Wind-diesel power plant at the oil-field (Tatarstan)

2013-2014

Wind-diesel power plant at the oil-field (Tatarstan)

Location

Russia, Republic of Tatarstan

Implementation period

2013-2014

Description of project

Wind-diesel power plant comprising 30 kW wind turbine

Scope of work performed

  • engineering
  • construction

Equipment

WTG Ghrepower FD 12-30/11 (China), 30 kW installed capacity

Comments

The first project in the oil-field. Project documentation was reviewed in State expertise due the fact that the wind farm is located on the territory of hazardous industrial facility. Project documentation has been agreed, WPP built and put into operation. First experience in installation and operation of Chinese wind power equipment received.

Wind-diesel power plant at Novikovo settlement

2014

Wind-diesel power plant at Novikovo settlement

Location

Russia, Sakhalin Region, Novikovo settlement

Implementation period

2014

Description of project

Wind-diesel power plant consisting of:

  • Wind farm 450 kW

Scope of work performed

  • construction

Equipment

Wind farm: 2 WTG manufactured by “TEMZ” LLC, 225 kW installed capacity each

Comments

At this project renovated wind power equipment was used (supplier — «TEMZ» LLC),that significantly reduced capital expenses. The project turned out to be surprisingly difficult to realize due to flooding of foundation pits (see photo), which were designed directly on the coast, almost at sea level (design works were outsourced). Carrying out works evoked curiosity on the part of local public (see photo).

Wind-diesel power plant at Ust-Kamchatsk settlement

2013-2014

Wind-diesel power plant at Ust-Kamchatsk settlement

Location

Russia, Kamchatka Region, Ust-Kamchatsk settlement

Implementation period

2013-2014

Description of project

Wind-diesel power plant consisting of:

  • Wind farm 900 kW

Scope of work performed

  • engineering
  • construction

Equipment

Wind farm: 3 WTG Komai KWT 300, installed capacity 300 kW each

Comments

This project was completely done by Activity LLC: from wind measurements to design and construction. This is the first project in Russia with Japanese wind turbine manufactured by Komaihaltec inc. This Komai ЦЕП was specially designed for cold climate conditions. In 2014 first wind turbine was installed. Installation of second and third wind turbines and wind farm commissioning are scheduled for 2015. The project is very difficult to perform from organizational and technical point of view: installation of wind turbines in a remote village at full absence of basic construction infrastructure. Wind turbine was installed using 200-tonnes track-mounted crane, which was delivered from Petropavlovsk-Kamchatsky (700 km of gravel road) on 7 long vehicles.